Watermore Infants School

Project Name: Watermore Infants School

Contract Duration: 10 Weeks

Completion Date: October 2022

This project consisted of the Demolition of the 1960s part of the primary school (formally for infant children)
along with slab removal. The red pennant sandstone Victorian building dated as
“1846 British School” is to remain.

Demolition of the 1960s part of the primary school (formally for infant children)
along with slab removal. The red pennant sandstone Victorian building dated as
“1846 British School” is to remain.

Works included the dismantling of dressed stone pillars to facilitate access to the site. The stone was stored on site and the pillars reinstated once the demolition works were completed. Soft strip of internal fixtures and fittings, in-house removal of asbestos containing materials, demolition of existing buildings down to top of floor slab, uplifting of slabs and foundations, crushing and stockpiling at agreed location. Two sections of the site were subject to Tree protection orders, these areas were fenced off to ensure no access.

KEY ELEMENTS

  • Dismantling of stone pillars
  • Asbestos removal as positively identified in the re-survey
  • Soft strip and removal of loose materials
  • Demolition down to top of floor slab
  • Uplifting of slabs and foundations 
  • Crushing to 6F2
  • Construction of stone pillars

 

  •  
  •  
  •  

Some of Our Projects

Watermore Infants School

Location: Woodend Rd, Frampton Cotterell, Bristol

Contract Duration: 10 Weeks

Completion Date: October 2022

Pencoedtre High School

Location: Merthyr Dyfan Road, Barry

Contract Duration: 20 Weeks

Completion Date: June 2022

South Gloucestershire Council

Location: Charborough Road, Bristol

Contract Duration: 28 Weeks

Completion Date: September 2019