Pencoedtre High School

Project Name: Pencoedtre High School

Contract Duration: 20 Weeks

Completion Date: June 2022

Bond Demolition were sucsessful in our tender for the Asbestos removal, Demolition, removal of ground slab and crushing of all arisings of Pencoedtre High School.

This project comprised a complex building containing internal courtyards. The structure to be demolished is a former high school and is predominantly of
clasp construction comprising of a steel frame, concrete bison beam intermediate flooring, external glazed cladding panels and a bitumen felted
and corrugated steel tray roof.

Works included the soft strip of internal fixtures and fittings, in-house removal of asbestos containing materials, demolition of existing buildings down to top of floor slab, uplifting of slabs and foundations, crushing and stockpiling at agreed location.

KEY ELEMENTS

  • Asbestos removal as positively identified in the re-survey
  • Soft strip and removal of loose materials
  • Demolition down to top of floor slab
  • Uplifting of slabs and foundations to a depth of 1.5m from floor slab level
  • Crushing to 6F2
  •  
  •  
  •  

Some of Our Projects

Watermore Infants School

Location: Woodend Rd, Frampton Cotterell, Bristol

Contract Duration: 10 Weeks

Completion Date: October 2022

Pencoedtre High School

Location: Merthyr Dyfan Road, Barry

Contract Duration: 20 Weeks

Completion Date: June 2022

South Gloucestershire Council

Location: Charborough Road, Bristol

Contract Duration: 28 Weeks

Completion Date: September 2019