Project Name:
Pencoedtre High School
Contract Duration:
20 Weeks
Completion Date:
June 2022
Bond Demolition were sucsessful in our tender for the Asbestos removal, Demolition, removal of ground slab and crushing of all arisings of Pencoedtre High School.
This project comprised a complex building containing internal courtyards. The structure to be demolished is a former high school and is predominantly of
clasp construction comprising of a steel frame, concrete bison beam intermediate flooring, external glazed cladding panels and a bitumen felted
and corrugated steel tray roof.
Works included the soft strip of internal fixtures and fittings, in-house removal of asbestos containing materials, demolition of existing buildings down to top of floor slab, uplifting of slabs and foundations, crushing and stockpiling at agreed location.
KEY ELEMENTS
- Asbestos removal as positively identified in the re-survey
- Soft strip and removal of loose materials
- Demolition down to top of floor slab
- Uplifting of slabs and foundations to a depth of 1.5m from floor slab level
- Crushing to 6F2