This site uses session-based and third party Google Analytics cookies to store information on your computer. Session-based cookies in order to allow the smooth running of user's sessions. We also use cookies to measure site performance and understand what parts of the site visitors go to. The Google Analytics cookies do not collect personal data. To view Google Analytics privacy policy see here http://www.google.com/analytics/learn/privacy.html. To opt out of Google Analytics go here https://tools.google.com/dlpage/gaoptout.

The "Help" menu in the toolbar of most web browsers will tell you how to change your browser's cookie settings, including how to have the browser notify you when you receive a new cookie, and how to disable cookies altogether. Disabling cookies can reduce the site's functionality.

OP Chocolates, Merthyr Tydfil

Project Overview

Asbestos Removal within OP Chocolates

Client – OP Chocolates Ltd

Project Location – Dowlais Merthyr Tydfil

Scope Of Works – Asbestos Removal

Duration Of Contract – 40 days

Contract Value - £170,000

Reference – Mr Alan Barker

Reference Contact – 07770 613018

 

The project referred to in this data sheet is the large scale asbestos removal above the main factory production area of OP Chocolates Merthyr, In order for works to take place a scaffold deck had to be designed and constructed above a number of live food production lines.

Project Description:
The removal of 1100m2 of asbestos insulation board and 100 linear metres of asbestos lagged pipe work was carried out within four separate enclosures, each constructed at high level above the pasting melts production line, each enclosure was constructed from timber baton and 1000 gauge virgin polythene and put under negative pressure. The primary aim throughout the removal contract was to maintain the safety of both OP Chocolates staff and our operatives without production being effected.

Constraints:
As explained above the asbestos removal works were to be carried out at high level above the pasting melt production line, the removal works were carried out under very cramped and very hot conditions and under the sensitive and sterile environment of a food production factory. Prior to erecting the scaffold each section had to be wrapped in clear polythene and sealed.

Clients Feedback

We have worked with Bond Demolition for the past 10 years using them for Asbestos removal and maintaining our Asbestos register. In 2011 we carried out a major project in our main food factory of asbestos removal of large lagged pipe work and a suspended ceiling whilst continuing food production underneath the removal works. The cost of the project was £170,000 and completed over a 6 month period, the project was carried out professionally, on time and with no major hiccups. I would have no hesitation of recommending Dean Williams and his team to carry out Asbestos removal in a safe and professional manner.

-
Tel: 02920 888 788
Bond Demolition Ltd
Bedwas House Industrial Estate
Bedwas
Caerphilly
CF83 8DW

Where to find us

Our address

Bond Demolition Ltd, Bedwas House Industrial Estate, Bedwas, Caerphilly, CF83 8DW

Contact info

02920 888 788
info@bonddemolition.co.uk
www.bonddemolition.co.uk
Copyright 2017 Bond Demolition, Demolition & Asbestos Services South Wales